AM Daily Construction Traffic Update: 4/11/16

3/11/2016

AM Daily Traffic Impacts

Monday, April 11, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 60th St. from 63rd St. from 7 a.m. to 5 p.m. 

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 3 lane between Westmount Ave. and 52nd St. from 9 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd. during that time. 

Downtown Inglewood Station: Potholing on Florence Ave. will require the closure of the westbound No. 2 lane at High St. from 11 a.m. to 3 p.m.

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from 10 a.m. to 2 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

More Information

Metro E-mail subscription

Go to Subscriber Preferences, enter your email, and manage your Metro Subscriptions. Reduce subscriptions or unsubscribe. 

Construction Notices

Can also be found at www.metro.net/crenshaw

Caltrans

For live traffic condition around construction sites please visit http://quickmap.dot.ca.gov/

Additional Programming

Financial Assistance for Small “Mom and Pop” Businesses

Metro's Business Interruption Fund (BIF) provides financial assistance to qualifying small “mom and pop” businesses directly impacted by construction; learn more by visiting Metro's BIF program administrator, Pacific Coast Regional Small Business Development Corporation.

Metro Crenshaw/LAX Transit Project Business Solution Center (BSC)

Metro's Crenshaw/LAX Transit Project Business Solution Center (BSC) provides resources, programs and support services to the small businesses along the Crenshaw/LAX transit corridor. For more information on BSC services please visit www.metrobsc.net/crenshaw

Transit Access Changes

Construction may result in changes to bus routes or stop locations. Metro will post signs at affected stops to advise of alternate boarding locations. Real-time information available at metro.net/service/advisories or 323.GO.METRO (323.466.3876)


Be the first to comment

Please check your e-mail for a link to activate your account.