PM Daily Construction Traffic Update: 4/4/16

04/4/2016

PM Daily Traffic Impacts

Click the station names for more information regarding each closure.

Martin Luther King Jr. Station: Jet grouting work will require a full closure of Crenshaw Blvd. between MLK Blvd. and Stocker St. from 9 p.m. to 6 a.m.

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from 9 p.m. to 5 a.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Additional Programming

Financial Assistance for Small and Locally Owned Businesses 

Metro's Business Interruption Fund (BIF) provides financial assistance to qualifying small businesses directly impacted by construction; learn more by visiting Metro's BIF program administrator, Pacific Coast Regional Small Business Development Corporation.

Transit Access Changes

Construction may result in changes to bus routes or stop locations. Metro will post signs at affected stops to advise of alternate boarding locations. Real-time information available at metro.net/service/advisories or 323.GO.METRO (323.466.3876)

More Information

Metro E-mail subscription

Go to Subscriber Preferences, enter your email, and manage your Metro Subscriptions. Reduce subscriptions or unsubscribe. 

Construction Notices

Can also be found at www.metro.net/crenshaw

Caltrans

For live traffic condition around construction sites please visit http://quickmap.dot.ca.gov/


Be the first to comment

Please check your e-mail for a link to activate your account.