Falsework Installation Daily Construction Traffic Update: 5/16/16

5/16/2016

Falsework Installation Preparation on Manchester Blvd. between Portal Ave. and Florence/Aviation

Click here to read the full notice. 

Summary

Walsh-Shea Corridor Constructors (WSCC) is working on the preparation for falsework installation (framing) on Manchester Av, west of Florence Av/Aviation Bl.  This work will require lane reductions on Manchester Av. One lane in each direction will be maintained at all times. 

The sidewalk on either the north or south side of Manchester Av will be closed at all times during the length of this activity on Manchester Av. Signs will guide pedestrians through the pedestrian detour. 

Essentials

WHAT: Falsework Installation Preparation

WHEN: May 13, 2016 from 9 p.m. to 6 a.m. and 9 a.m. to 3 p.m., Monday through Friday, weather permitting

WHERE: Manchester Ave. between Portal Ave. and Florence Ave./Aviation Blvd.

DURATION: Two weeks

What to Expect

  • Local access will be maintained
  • Lane reductions for eastbound and westbound traffic on Manchester Ave. at Florence Ave./Aviation Blvd.
  • One lane in each direction will be maintained at all times.
  • The sidewalk on the south side of Manchester Ave. will be closed between Bellanca Ave. and Florence Ave./Aviation Blvd. Upon completion and reopening of the new pedestrian covered walkway, WSCC will close the north side sidewalk. 

Noteworthy

Support Local Businesses! Businesses are open during construction. Eat, Shop, Play Crenshaw and Inglewood. Take the Pledge and join us for an upcoming Lunch Meetup or other community event. Click below to pledge your support or get more information at Crenshaw/LAX Transit Project.

I PLEDGE TO SUPPORT

Support Services for Businesses Metro's Business Interruption Fund (BIF) provides financial assistance to qualifying small businesses directly impacted by construction; learn more by visiting Metro's BIF program administrator, Pacific Coast Regional Small Business Development Corporation

Metro Crenshaw/LAX Transit Project Business Solution Center (BSC) provides resources, programs and support services to the small businesses along the Crenshaw/LAX transit corridor. For more information on BSC services please visit www.metrobsc.net/crenshaw

Caltrans - Live Traffic For live traffic condition around construction sites please visit http://quickmap.dot.ca.gov/


Be the first to comment

Please check your e-mail for a link to activate your account.