4/21/2016
AM Daily Traffic Impacts
Thursday, April 21, 2016
Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 63rd St. and 66th St. from 7 a.m. to 5 p.m.
Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 2 and No. 3 lanes between Westmount Ave. and 50th St. from 7 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd. from 7 a.m. to 3 p.m.
Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the westbound and eastbound No. 2 lanes at Florence Ave. from 8 a.m. to 3 p.m.
Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from10 a.m. to 2 p.m.
Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.
Long Term Ongoing Work
Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.
Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016.
Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.
For live traffic condition around construction sites please visit http://quickmap.dot.ca.gov/
Additional Programming
Financial Assistance for Small “Mom and Pop” Businesses
Metro's Business Interruption Fund (BIF) provides financial assistance to qualifying small “mom and pop” businesses directly impacted by construction; learn more by visiting Metro's BIF program administrator, Pacific Coast Regional Small Business Development Corporation.
Metro Crenshaw/LAX Transit Project Business Solution Center (BSC)
Metro's Crenshaw/LAX Transit Project Business Solution Center (BSC) provides resources, programs and support services to the small businesses along the Crenshaw/LAX transit corridor. For more information on BSC services please visit www.metrobsc.net/crenshaw
Transit Access Changes
Construction may result in changes to bus routes or stop locations. Metro will post signs at affected stops to advise of alternate boarding locations. Real-time information available at metro.net/service/advisories or 323.GO.METRO (323.466.3876)
Be the first to comment
Sign in with