AM Daily Construction Traffic Update: 4/26/16

4/26/2016

Daily Traffic Impacts

Tuesday, April 26, 2016 

Martin Luther King Jr.: Patch and paving work on Crenshaw Blvd. will require the closure of the southbound No. 2 lane between Coliseum St. and MLK Blvd. (11 a.m. - 3 p.m.) and between Homeland Dr. and Vernon Ave. (9 a.m. - 3 p.m.). 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the southbound No. 1 lane and left-turn lanes between 63rd St. and 67th St., the northbound No. 1 lane and left-turn lanes between 67th St. and Hyde Park Blvd. from 7 a.m. to 5 p.m. The work will also require the closure of the northbound No. 2 lane from West Villas Driveway to 60th St. from 9 a.m. to 3 p.m.

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 2 and No. 3 lanes between Westmount Ave. and 50th St. from 7 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd.  from 7 a.m. to 3 p.m.

Hyde Park Station: Storm drain installation will require a full closure of 52nd St. at Crenshaw Blvd. from 9 a.m. to 3 p.m.

Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the eastbound and westbound No. 2 lanes at Florence Ave. from 8 a.m. to 3 p.m. 

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from10 a.m. to 2 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Long Term Ongoing Work 

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

PM Daily Construction Traffic Update: 4/25/16

4/25/2016

Monday, April 25, 2016

Daily Traffic Impacts

No traffic impacts anticipated for this evening.

Ongoing Long Term Work:

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

AM Daily Construction Traffic Update: 4/25/16

4/25/2016

Daily Traffic Impacts

Monday, April 25, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 63rd St. and 67th St. from 7 a.m. to 5 p.m. 

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 2 and No. 3 lanes between Westmount Ave. and 50th St. from 7 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd.  from 7 a.m. to 3 p.m.

Hyde Park Station: Storm drain installation will require a full closure of 52nd St. at Crenshaw Blvd. from 9 a.m. to 3 p.m.

Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the eastbound and westbound No. 2 lanes at Florence Ave. from 8 a.m. to 3 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Long Term Ongoing Work 

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

PM Daily Construction Traffic Update: 4/21/16

Thursday, April 21, 2016

Daily Traffic Impacts
 

No traffic impacts anticipated for this evening.

Ongoing Long Term Work:

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

AM Daily Construction Traffic Update: 4/21/16

4/21/2016

AM Daily Traffic Impacts

Thursday, April 21, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 63rd St. and 66th St. from 7 a.m. to 5 p.m. 

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 2 and No. 3 lanes between Westmount Ave. and 50th St. from 7 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd. from 7 a.m. to 3 p.m.

Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the westbound and eastbound No. 2 lanes at Florence Ave. from 8 a.m. to 3 p.m. 

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from10 a.m. to 2 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Long Term Ongoing Work 

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

 

Read more
Add your reaction Share

PM Daily Construction Traffic Update: 4/20/16

PM Daily Traffic Impacts

No traffic impacts anticipated for the evening of Wednesday, April 20th.

Ongoing Long Term Work:

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

AM Daily Construction Traffic Update: 4/20/16

4/20/2016

Daily Traffic Impacts

Wednesday, April 20, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 63rd St. and 67th St. from 7 a.m. to 5 p.m. 

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 2 and No. 3 lanes between Westmount Ave. and 50th St. from 9 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd. from 7 a.m. to 3 p.m.

Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the westbound and eastbound No. 2 lanes at Florence Ave. from 8 a.m. to 3 p.m. 

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from10 a.m. to 2 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Long Term Ongoing Work 

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

PM Daily Construction Traffic Update: 4/19/16

4/19/2016

PM Daily Traffic Impacts

Tuesday, April 19, 2016

Click the station names for more information regarding each closure.
No short-term traffic impacts anticipated for this evening.
Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.
Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 
Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.
Read more
Add your reaction Share

AM Daily Construction Traffic Update: 4/19/16

3/19/2016

AM Daily Traffic Impacts

Tuesday, April 19, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 60th St. from 63rd St. from 7 a.m. to 5 p.m. 

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 3 lane between Westmount Ave. and 52nd St. from 7 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd. during that time. 

Downtown Inglewood Station: Storm drain work at the intersection of Centinela Ave. and Florence Ave. will require the closure of the southbound No. 2 lane on Centinela Ave. and the closure of the eastbound and westbound No. 1 lane and left turn lane on Florence Ave. at the intersection from 9:30 a.m. 3:30 p.m.

Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the westbound and eastbound No. 2 lanes at Florence Ave. from 8 a.m. to 3 p.m. 

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from10 a.m. to 2 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

AM Daily Construction Traffic Update: 4/14/16

4/14/2016

Daily Traffic Impacts

Thursday, April 14, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 60th St. from 63rd St. from 7 a.m. to 5 p.m. 

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 3 lane between Westmount Ave. and 52nd St. from 9 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd. during that time. 

Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the westbound and eastbound No. 2 lanes at Florence Ave. from 8 a.m. to 3 p.m.

Downtown Inglewood Station: Potholing on Eucalyptus Ave. will require closure of the northbound and southbound No. 2 lanes at Florence Ave. from 9 a.m. to 3 p.m.

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from10 a.m. to 2 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more