AM Daily Construction Traffic Update: 4/13/16

4/13/2016

Daily Traffic Impacts

Tuesday, April 12, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 60th St. from 63rd St. from 7 a.m. to 5 p.m. 

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 3 lane between Westmount Ave. and 52nd St. from 9 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd. during that time. 

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from10 a.m. to 2 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
1 reaction Share

PM Daily Construction Traffic Update: 4/12/16

4/12/2016

PM Daily Traffic Impacts

Click the station names for more information regarding each closure.

No short-term impacts planned for this evening.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

AM Daily Construction Traffic Update: 4/11/16

3/11/2016

AM Daily Traffic Impacts

Monday, April 11, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 60th St. from 63rd St. from 7 a.m. to 5 p.m. 

Hyde Park Station: Storm drain installation on Crenshaw Blvd. will require the full closure of the southbound No. 3 lane between Westmount Ave. and 52nd St. from 9 a.m. to 3 p.m. This work will also require the full closure of the frontage road along Crenshaw Blvd. during that time. 

Downtown Inglewood Station: Potholing on Florence Ave. will require the closure of the westbound No. 2 lane at High St. from 11 a.m. to 3 p.m.

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from 10 a.m. to 2 p.m.

Aviation/Century Station: Work on a support wall on Aviation Blvd. will require the closure of the southbound No. 2 lane at 111th St. from 10 a.m. to 2 p.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

PM Daily Construction Traffic Update: 4/7/16

4/7/2016

Daily Traffic Impacts

Click the station names for more information regarding each closure.

No short-term impacts planned for this evening.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

PM Daily Construction Traffic Update: 4/6/16

PM Daily Traffic Impacts

Wednesday, April 6, 2016

Click the station names for more information regarding each closure.

Martin Luther King Jr. Station: Jet grouting work will require a full closure of Crenshaw Blvd. between MLK Blvd. and Stocker St. from 9 p.m. to 6 a.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

AM Daily Construction Traffic Update: 4/6/16

04/6/2016

Daily Traffic Impacts

Tuesday, April 5, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes between 60th St. from 63rd St. from 7 a.m. to 2:30 p.m.  

Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the westbound No. 2 lane and the southbound No. 2 lane on Centinela Ave. between Florence Ave. and High St. from 9 a.m. to 3 p.m. 

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from 9 a.m. to 2 p.m.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

FULL STREET CLOSURE: APRIL 8, 2016

Framing (Falsework) Installation at Aviation Blvd. and Imperial Hwy.

Click here to read the full notice. 

Summary

Walsh-Shea Corridor Constructors (WSCC) will be implementing a full street closure on Aviation Blvd. for framing (falsework) installation. The closure implementation will take place from 9 p.m. on Friday, April 8, 2016 to 6 a.m. Monday, April 11, 2016. 

Southbound Detour:

-          Eastbound on Imperial Hwy

-          Southbound on La Cienega Blvd.

-          Westbound on 120th St.

-          Southbound on Aviation Blvd.

Northbound Detour:

-          Eastbound on 120th St.

-          Northbound on La Cienega Blvd.

-          Westbound on Imperial Hwy.

-          Northbound on Aviation Blvd.

Access through Imperial Hwy. will be maintained. 

Essentials

WHAT: Full street closure for falsework installation

WHEN: Friday, April 8, 2016 from 9 p.m. through 6 a.m., Monday, April 11, 2016

WHERE: Aviation Blvd. south of Imperial Hwy. to 118th St.

DURATION: One weekend

What to Expect

Access for emergency responders will be maintained. 

Read more
Add your reaction Share

PM Daily Construction Traffic Update: 4/4/16

04/4/2016

PM Daily Traffic Impacts

Click the station names for more information regarding each closure.

Martin Luther King Jr. Station: Jet grouting work will require a full closure of Crenshaw Blvd. between MLK Blvd. and Stocker St. from 9 p.m. to 6 a.m.

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from 9 p.m. to 5 a.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

AM Daily Construction Traffic Update: 4/4/16

4/04/2016

Daily Traffic Impacts

Monday, April 4, 2016 

Hyde Park Station: Pile installation on Crenshaw Blvd. will require closure of the northbound and southbound No. 1 lane and left-turn lanes at 60th St. from 9 a.m. to 2:30 p.m. 

Hyde Park Station: Driveway relocation on Crenshaw Blvd. will require closure of the southbound No. 2 lane between Hyde Park Blvd. and 63rd St. from 9 a.m. to 3 p.m.

Downtown Inglewood Station: Potholing on Ivy Ave. will require closure of the westbound No. 2 lanes between Florence Ave. and High St. from 9 a.m. to 3 p.m. 

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from 9 a.m. to 2 p.m.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share

PM Daily Construction Traffic Update: 3/31/16

3/31/2016

Daily Traffic Impacts

 

Martin Luther King Jr. Station: Jet grouting work will require a full closure of Crenshaw Blvd. between MLK Blvd. and Stocker St. from 9 p.m. to 6 a.m.

Martin Luther King Jr. Station: Jet grouting work will require closure of the northbound and southbound No. 2 lanes of Crenshaw Blvd. between Homeland Dr. and Vernon Ave. from 9 p.m. to 6 a.m.

Downtown Inglewood Station: Removal of temporary bridge supports (falsework) will require a full closure of La Brea Ave. between Florence Ave. and Beach Ave. from 9 p.m. to 6 a.m., as well as a closure to the eastbound No. 2 lane on Florence Ave. at La Brea from 9 p.m. to 6 a.m.

Aviation/Century Station: Excavation along the right-of-way on Aviation Blvd will require the closure of the southbound No. 1 and No. 2 lanes from 104th St. to 111th St. from 9 p.m. to 5 a.m.

Aviation/Century Station: Installation of temporary bridge supports (falsework) will require closure of the northbound and southbound No. 2 lanes between Imperial Hwy. and 116th St. from 9 p.m. to 6 a.m.

Fairview Heights Station: Permanent roadway reconfiguration requires the closure of Victoria Ave. between 67th St. and 71st St.

Downtown Inglewood Station: The guideway closure at Cable St. requires a full northbound and southbound closure of Cable St. at Ivy Ave. until October 15, 2016. 

Westchester/Veterans Station: The grade closure at Portal Ave. requires a full eastbound and westbound closure of Portal Ave. at the Bellanca Ave. alleyway until May 2, 2016.

Read more
Add your reaction Share